Artistic Construction, LLC

Artistic Construction, LLC

Overview

Serves Woodstock, GA

Business hours

SunClosedMon8:00 am - 6:00 pmTue8:00 am - 6:00 pmWed8:00 am - 6:00 pmThu8:00 am - 6:00 pmFri8:00 am - 6:00 pmSat9:00 am - 2:00 pm

Payment methods

This pro accepts payments via Cash, Check, Credit card, and Debit card.

Services offered
Contact

+14708302257

12195 Hwy 92 Suite 114 #434, Woodstock, GA 30188

Reviews
4.0

101 reviews

5

4

3

2

1

Scott Martin

Sep 10, 2024

•From Google
Green Summit was hired to remodel two bathrooms for us. The workmanship was fine - we had no complaints with the quality of work. The management was harder to work with. Upon signing the contract and paying 50% up front in March, Josh told us that they would mobilize on April 15th, or the 22nd at the latest. We purchased the thousands of dollars of needed materials and lined up delivery dates. When 4/15 came and we hadn't heard from Josh, we followed up. He told us it would be pushed back a week due to problems at another job. No big deal, we were warned it might be 4/22. That date came and went, we pushed for an answer and we were told end of April. That came and went and we pushed for an answer and were told the first week of May. Then we were told it would be the 6th. We eventually got fed up with this and, on May 1, we issued Josh a letter asking to cancel the project. He "spoke with his brother" and magically had a crew which would definitely be available to start the following Tuesday, May 7th. Fortunately for Josh, Christian was the lead on site. Christian knows his job and how long it'll take. For the following four weeks, we would check in with Christian, who would give us his plan and timeline. Josh would drop in for a few minutes, speak with Christian, then cut a day or two off of the short term goal to tell us a shorter timeframe (which was missed every time). We learned to just listen to Christian when it came to scheduling expectations. As for cost, we had a few change orders. Pricing on the changes was consistently fair. I had to ask several times to get the first change orders (scope adds we requested) documented but Josh did eventually send out emails to document. The second change order was not discussed until after they had already completed the work. We agreed to the charge, as the pricing was fair and the work was above the original scope (mostly furring out a wall due to tilework concerns - something that should have been visible and caught at the time of bidding). However, upon final billing, the price for this change increased by $125. It didn't seem malicious and it wasn't a huge amount but the discrepancy wouldn't have happened if they had a) notified us of the change ahead of the work, and b) documented it once it had been agreed on. We expected to be present for most of the work but we didn't expect to have to micromanage details in communication. I hope in the future, they learn to provide reasonable timelines with safety factors built in so that customers are not as frustrated. They've got a good team - especially the fully trained guys - but they definitely need to be more careful in the communication. If I had it to do over again, I would not put the 50% down until they mobilized on site. They had our money for an extra 3 weeks and, when a job is running behind and communication is lacking, that becomes very stressful - especially when you're having to constantly ask the contractor what's going on rather than him just keep you in the loop from the onset. (Josh did apologize several times for his lack of communication.) We have to give Green Summit credit for their work as it was good. They had relatively few punch list items (and we're picky people) and they responded to each in a timely fashion. No item took more than 24 hours for to fix after it was brought to their attention. Josh also made sure that they covered the expense of repairing chips in a tub that happened during the construction. They delivered what was promised and created some innovative solutions to small items along the way that we were impressed with. If time is not a priority and you're ok with being very careful with documentation, they are a good and fair priced option. Follow up: We had a warranty issue (material issue with the grout) and they were prompt to respond and took care of the problem with no issues. I do have to give them credit for standing behind their work with no questions.

Jessica

Aug 18, 2024

•From Google
From the start, Green Summit was always late. We can’t recall a single time that Josh or the team arrived when they said they would. We were told it would take 4-5 days to complete the job of smoothing the ceilings in our home, start to finish. Instead, it took 11 full days of us not being able to use our downstairs, plus an additional month after that for their team to go back over the errors from their work. While one team member in particular was hard-working and stayed late on multiple occasions to get the work done, we felt that the team did not do quality work and there was very little attention to detail. On their first day of working, the team stood on and walked on our uncovered dining room table and countertops instead of using a ladder. They painted over 7 over our 9 brand new recessed lights that had just been installed the day before, and it was a headache trying to get them to replace these lights, with an excessive amount of miscommunication and back and forth between Josh and the team. When their work was “complete,” we found an unacceptable amount of seams, cracks and uneven areas on the ceiling, as well as many more imperfections in their patchwork and painting. The more we looked at the work, the more issues we found. I made multiple lists with photos and descriptions for things we weren’t satisfied with and I shared these with Josh, but it didn’t seem that these lists were utilized or communicated to the subcontractors completing the work. When expressing our dissatisfaction, there was no apparent concern from Josh regarding the poor workmanship, and no sense of urgency or clear steps for getting anything fixed. To us, it felt that the communication and follow through honestly became worse after we expressed how unhappy we were with the product. They said they would come back on a certain day to fix things, but that day would come and go without anyone showing up and without any communication from their team. We continuously had to follow up to see when they were coming, and we had to constantly repeat ourselves because things kept getting missed. The process became increasingly frustrating and we ended up being much more involved than we would have liked. We eventually started choosing our battles on what we were asking them to fix and what we were just going to fix ourselves after they left, because we wanted to be done with the process. Ultimately, we are not happy with the product we got and we feel it is in no way worth what we paid. Now, 3 months after the completion of their project, we are frustrated when we look at our ceiling and see the countless imperfections. The actions from Green Summit showed they did not care about our satisfaction, and our experience with them from start to finish was not what we anticipated. We regret our choice in selecting Green Summit, and we would not recommend their services. We are giving 2 stars because Josh and the team seem like genuinely good people, but their customer service, professionalism, communication, and follow through left much to be desired.

Marc Ahrens

Sep 17, 2023

•From Google
We have been waiting to write this review because we really struggled with it and I wanted it to be a more positive review. But now that we are a few weeks past "completion" of the job and we have noticed more and more errors, I thought now would be a good time. First of all, anyone reading this realizes just how difficult it is to find a responsive contractor to do anything on your home. Then, to have any expectation that they will do a professional job is the next hurdle. I happen to be a very skilled DIYer myself and have very high standards. But there are simply some projects that without the tools and equipment are just too big to tackle--and painting the exterior of our home is one of them. When I first met Josh during the estimate, I was very impressed with his level of detail and eye for things that needed to be done, so we selected Green Summit to do the work. However, shortly into the project, we quickly realized that the crew that was subcontracted was not going to be able to live up to the initial impression we had of Josh. I wont run through the entire punch list of errors, some of which we are still discovering, but it should have started with the desire by the crew to paint and stain during some of the coldest and wettest weather we had this year. They should have canceled instead of rushing through the job. We have a new construction porch over an existing deck that is only 5 years old. Problems started when the sub claimed that they power washed the deck to the point that if they did more, they would damage it. I know for a fact that isn't the case. I power washed that deck with an appropriate surface head on my sprayer last spring with zero issues. The deck surface when they were done just looked like they scattered bleach over it and hosed it off. There was no pressure washing done. Period. Then, the woodwork repair--of which we had some window trim and chimney trim issues--was terrible. They did make an attempt to fix, but I myself completely replaced two large windows with all new PVC brick mold and sills, and to say that I look like the pro vs them, is an understatement. Then, the caulk job at the joints, around windows, etc.--if done at all--looks terrible. I have found more places that it wasnt done at all then I can find that were done. Finally, we just found that one of the door frames that was rotted, was simply filled with caulk after the contractor jammed a screwdriver into it. And the icing on the cake was that no one asked us to raise the windows a bit so the entire sill could be painted, so now we have strips under the windows that arent even painted. We tried. My wife gave them punch list after punch list, but we are terribly disappointed. It was an expensive project and I really wanted this to be more positive, but we just cant. I'm kicking myself for not being more aggressive with the quality of the work, but frankly just wanted them gone.

Emilie Morrison

Sep 17, 2023

•From Google
I could talk for hours about our wonderful experience with GSC. From the first complimentary consultation, Mitchell made us feel very comfortable and confident. He spoke well about his company, their strengths, skill set, project timeline and scope, and budget/pricing. We were looking to remove carpet in our second floor loft and hallway and replace with LVP. We also wanted to add a wall with double barn doors to create an office space where the loft was previously open. He provided a quote within a timely manner and allowed my husband and I a few days to discuss before moving forward. Once we had signed our contract, he kept in touch regarding scheduling and was able to get our project started sooner than expected! Christian and the other contractors were at our home every day and were phenomenal. They always kept the space tidy and would clean at the end of every day including taking up the canvas they had laid on our stairs which was above and beyond to keep our home free of any construction debris. During the project, I ended up adding on a few additional smaller projects and thankfully Mitchell and Christian took it in stride and easily added the workload. The end result was absolutely stunning! It looks like the flooring and wall have always belonged in this house and we are thrilled with the end result. I would highly recommend Green Summit Contracting, and we will be using them again in the future for any of our painting or renovation needs.

jacob cate

Sep 3, 2024

•From Google
Great experience! My wife and I decided to renovate our kitchen and bathroom, and these guys knocked it out of the park. 1. Quality and Speed: The work was fantastic. Josh has assembled a great crew of skilled workers who completed the project ahead of schedule and with high quality standards. We are in love with the results of our new walk-in shower, tiled floor, vanity, countertops, backsplash, and wood-vinyl flooring. There was no wasted time and the workers did a decent job of keeping things clean and organized within reason. 2. Communication: Josh was on-call and responsive for the entire project. Christian and his crew were very timely, organized, and clear. They made sure to inform us about the process at every step and kept us in the loop. 3. Above and beyond: The additional coat of paint his guys did saved us needing to DIY or call another crew. They even painted our high kitchen ceilings. They fixed things we didn't ask for and installed doorknobs I had left out with the intention of doing it myself. They've been very quick about fixing small issues that popped up, like a minor leak in the sink from a faulty garbage disposal seal (within 24 hours). Overall, we are extremely happy and can see why they are #1!
Is this your business?

This business hasn't been claimed yet. Claim it to manage your listing.