Paul Davis Restoration

Paul Davis Restoration

Overview

Serves Newport News, VA

35 employees

Business hours

SunClosedMon8:00 am - 6:00 pmTue8:00 am - 6:00 pmWed8:00 am - 6:00 pmThu8:00 am - 6:00 pmFri8:00 am - 6:00 pmSat9:00 am - 2:00 pm

Payment methods

This pro accepts payments via Cash, Check, Credit card, and Debit card.

Contact

s.king@pdr-sd.com

+17579691994

511 Muller Ln, Newport News, VA 23606

Reviews
4.0

356 reviews

5

4

3

2

1

Teddy Burgraff

Apr 20, 2024

•From Google
Here is a list for items that needed further work for repairs that were done improperly or negligently. Roof 1. Color- I had a gray roof. Black was put on. Never discussed. 2. Valley Tin- This was taken out and not replaced. 3. Drip Edge- Runs all the way around the roof with no gutter apron applied. 4. Cracked Sheet- Never replaced. Truss Repair 1. Truss repair- see photo. Can't begin to explain the work. Gutters 1. I had “Leaf Guard” gutters. This is a $13K gutter system. New gutter was not leafguard, had no cover, and not installed correctly. Pitched wrong amongst other problems. Interior 1. Containment- Area was poorly contained for fiberglass debris. Large double intake vent was not sealed causing fiberglass all over the residence. Once I noticed the fiberglass floating heavily in the basement and burning my nose and throat, I asked that the vent be taped off and sealed. I then left the residence due to the heavy contamination and did not want to expose my eight month old daughter to that. I checked back at the end of the day after the workers had left, and the vent was still not taped off. I taped it off myself to stop further spread on following days. 2. Open Ceiling Overnight- Drywall and insulation torn down. Ceiling then left wide open for the night. I have a vented attic and vented soffits. Temperature outside was 6 degrees when I checked on the home with a low during the night forecasted at -7 degrees. I put a thermometer in the work area at 6:55pm. My house could only maintain an indoor temp was 43 degrees. My public service reflected this. Ceiling needed to be sealed from the cold steady draft the same day it was left opened. I had pipes freeze in my home due to this. Luckily, they did not burst. 3. Displacement- No living displacement discussed. Due to fiberglass whole home contamination, it was not safe for my family (wife,2-year-old, 8-month-old, and myself) to remain at the residence. Along with limited running water with the frozen pipe in the bathroom. 4. Workmanship- Only the ceiling was textured (poorly) and painted. Walls were left smooth when they also should have been textured. The wall was left unpainted with plaster as a final coat. See photo. 5. Finishing- Never rehung my chandelier in the dining room. 6. Cleaning- My vents were cleaned by Well House duct cleaning. The rest of my home was covered in fiberglass and not cleaned. 7. Damage to property- my blinds were taken down and put into the living room. My kitchen table and furniture were piled on the blinds. All my blinds were destroyed and needed to be replaced at my own expense. Siding 1. Type- What arrived was the wrong style. 2. Exposure- Siding taken off and bare wood left uncovered with no house wrap over the weekend. It stormed that weekend… Window 1. Nine months into the project I asked about the window. Project manager was unaware it was being replaced. I showed him the contract. When it arrived there were no screens and that had to ordered separate. 4/02/24 the window is still not finished being installed. General Contract Work 1. Complete lack of oversite and management. Threat of Lien 1. 2/26/24 I received a call from Paul Davis bill collections. They were asking why no payment was made and that a lien was going to be placed on the property. They stated the account had been closed out and marked complete. As of 4/2/24 I still have no gutters and the window is incomplete. Garbage 1. The original roofers left garbage such as sandwich wrappers, chips, and sodas all over the property. I am still finding nails regularly in my yard and landscaping. 2. Garbage bags and deck rail were left in my front yard for four months. I finally disposed of them on my own at my own expense. Paul Davis refused to dispose of the projects garbage. Moving Forward We are now a few months shy of two years into the project (with an original majority completion time estimated at 100 days) and the project is still not done. With no completion date set or any further plans to complete the project.

Siua M

Oct 6, 2018

•From Google
The ABSOLUTE WORST EXPERIENCE!!! We had a very small flood in our home in Jan. Our insurance (All State) recommended them to do the clean up and repairs. Skip to the bottom of my long winded rant for a "quick" review. They came out the next day went through clean up and told us someone would contact us within the next week. So we waited... and waited... No one contacted us. So we called and scheduled for someone to come out to the property. Super nice guy came out gave us a game plan, we picked out materials to be used for the floors. He let us know he had to run it pst the insurance and would let us know in about a week or so. So we waited... and waited... No call after 2 weeks (yes we were patient and didn't want to cause any problems) Called and spoke to a wonderful secretary who let us know she would pass on the message and have the guy we were working with contact us. And we waited... After a while we called again. and waited for a response. We were annoyed at this point and called our insurance and asked to use someone else. Our insurance guy said to stick with Paul davis, he would call them to make sure we get taken care of. Funny enough, we got a call within the hour. This time it was with a different gentleman then before, he was going to help us. We set up an appointment for a week later because he was busy at the time. (its probably April... at this point. Flood was in Jan) He was also super nice (Side note: everyone we spoke to was very nice) we talked about flooring options again and went back and forth on materials. We ended the meeting with a good idea of what to do, he would email us a couple different options and the prices to do the work. He promised within the next few days... And we waited... It didn't come in the next few days. We called and emailed, and called and emailed. Finally we get a hold of him and he said he would bring over samples of our options. This time we set an appointment (we are sick of waiting at this point) He shows up with samples and we pick out exactly what we want. He lets us know we should be able to start work by the end of the week. And we waited... No confirmations, no appointments, NOTHING! we email and call, and email and call... Finally we give up. Call our insurance again and tell them how our claim from JANUARY still hasn't been fixed. After some work on the phone, the insurance is just going to send us a check and we will find someone else to do the repairs. About an hour after our conversation with the insurance. We get a call from "the guy" saying. "I wish you would have talked to me sooner, I had a team ready to go on Wednesday" HA HA HA... We called our insurance and told them they should be taken off of the recommended contractors list. Long story short: Small flood happens in January, insurance approves claim quickly. Paul Davis Restoration makes promises of service but repeatedly failed to communicate with us and do any type of follow through. In August our home still hasn't been repaired and we will go somewhere else.

Clayton Boyle

May 16, 2024

•From Google
June of 2023 my basement flooded, Paul Davis showed up and got to work right away ripping out carpet, flooring, and getting vacs and driers setup. I asked if they are going to cut the walls and was told no it’s just paneling and will dry. Asked what’s behind the paneling though how will we know everything is dry behind it and never got an answer, fast forward a week in June and the fans are still going in my basement. And wet items are still downstairs IE. couches, furniture, rugs, etc. my insurance company had to call several times to get them back to our house. They came back and asked again about the paneling and they put a machine on the wall and the machine said “dry” which is great grand wonderful but what about behind the paneling, took another week and my 11 year old to send pictures of the paneling peeling and crumbling and oh my goodness there was drywall behind the paneling. I sent these pictures to Justin (project manager) and he agreed everything needs to come out now after 2 weeks of the drywall soaking up water now, so they began demo after insurance company said to gut the basement now since they failed to do their job correctly. Instead of getting a dumpster to my house right away for this they stalled and began removing things and just throw them in my front yard which I have pics of still and was told oh we can’t get a dumpster today, a week later I had to pay for a dumpster out of my own pocket since they couldn’t be bothered to get one and left everything in my front yard in the grass. Now at this point most of the walls are removed and the ceiling is not and there’s about 5” of wall left around the top under the ceiling that they are just going to leave, my insurance company said no that is not staying take it out, after a lengthy argument through text with Harold about this I fired Paul Davis from finishing the “job” and hired service master to finish everything which they did a great job, and had to get a mold company from Omaha to come up and test everything all because Paul Davis was being lazy and didn’t want to do their job correctly. A 10-15k dollar job turned into $70,000.00 for a complete basement remodel all because Paul Davis left our basement with water behind the walls because they didn’t do a simple flood cut to see what’s behind everything. After all this they wanted almost 5,000 still and they threw away my personal property in the basement and NEVER gave me a list of what was thrown away so I could submit to insurance to get paid for these items. After ALL of this Harold the manager tried to get me to sign a paper or basically a NDA stating that I will not contact BBB or post anything talking about what happened at my house and how they “dropped the ball” which is in Justin’s own words in text. I in fact DID NOT sign this paper and just posting this review so hopefully others don’t have to go through what we did.

Diane Roberts

Jun 19, 2024

•From Google
I had a dishwasher leak that went all over the kitchen under the snap and lock floors and also down into the basement. I had black mold growing in the basement and also in the kitchen. Devin, Sebastian, Austin and Anthony from the mitigation team did a fabulous job of getting everything tore out, the water cleaned up and lastly hit it with the mold spray, and set the Dehu, air scrubber and fans. They worked efficently (and together) communicating with us and each other. They worked very hard to get everything done quickly. There Mitigation PM Kelly was very good and quickly got everything over to USAA for a quick approval. I was waiting on Restoration to get to the house and start the process of getting an estimate together and sending the estimate to USAA and putting the Kitchen back in order so that I could feed my disbled Step-son. When I had not heard anything, Kelly got me over to the PM Anthony from Restoration. the information that I received was that Anthony did not want to do my job putting me off another 2 days of getting an estimate over to USAA. I was reassigned to Delialiah and Russell and he is coming over on Thursday. I am not please at all with Anthony's behavior. This is nothing new, this is how he acted at Servicemaster. However, Cody is a dream, and anyone would be lucky to have him come to there home and help them. Paul Davis would be wise to understand that USAA probably in the end will pay around 32,000 for this claim, and to be shoved around by an arrogant, paronoid, and over all mean spitited human being is crazy when I am paying you a nice pay day for 1 claim.

Grant Herman

Sep 17, 2017

•From Google
We are a large summer camp in Northern Wisconsin called Camp Manito-wish YMCA. We were hit by a severe storm in mid-may with hundreds of large trees down, damage to buildings, fence lines, trails etc. Our biggest volunteer day of the year takes place on Memorial Day weekend with 250 volunteers that stay in our summer camp cabins while they help us open up camp for the summer season. Paul Davis secure a number of contractors to deal with all of the safety issues associated with tree damage, stabilize our building and removed all trees directly in the middle of camp in less than 10 days. It was incredible from our perspective as it took extensive coordination of a variety of vendors to get the first phase of this project done in this time frame. Immediately after that weekend they were back at it so that summer camp could open in mid-June. Again the coordinated an entire second effort to clear many areas of trees, do permanent fixes on the buildings and collaborated with us to provide relevant and timely information to our insurance carrier. They worked with as many local vendors as possible and brought in contractors and materials when they weren't available near to camp. All in all it was an outstanding effort. Camp started yesterday, our buildings and walkways are safe and in most areas you can not tell that they were ever here! They helped us on another very different issue 2 years ago with equally high performance. If you ever really need help to get you through serious interruption of services, these are the people to call from my perspective.
Credentials
License

License number: #154101

Is this your business?

This business hasn't been claimed yet. Claim it to manage your listing.