Cleary Building Corp.

Cleary Building Corp.

Overview

Serves Pittsfield, IL

Business hours

SunClosedMon8:00 am - 6:00 pmTue8:00 am - 6:00 pmWed8:00 am - 6:00 pmThu8:00 am - 6:00 pmFri8:00 am - 6:00 pmSat9:00 am - 2:00 pm

Payment methods

This pro accepts payments via Cash, Check, Credit card, and Debit card.

Contact

+12172856482

1201 W Washington St, Pittsfield, IL 62363

Reviews
3.0

144 reviews

5

4

3

2

1

Shaundra Pittenger

Oct 20, 2022

•From Google
just nowNEW We signed our contract with Cleary buildings on 3/19/2021. We had never had anything built before. We had lots of questions and concerns since our property was in a flood zone. We wanted to make sure this would no cause any unforseen issues. As we had a set budget and would be unable to go over. Our sales rep assured us this would not be an issue and that he would hold our hand through the entire process. That he would help with the permits and anything else that would need to be done. They told us the build would be completed by the end of July. We never heard a peep from them after that . On August 3rd we reach out to our sales rep. We were told that they were having issues with Pueblo Zoning. Because the explanation didn't make sense. I contacted Pueblo Zoning and was told they had only had one email concerning our property and it was dated August 1st . The zoning office informed me that there was indeed a process when building in a flood zone. Starting with an enginer to the tune of $2000.00 . Who informed us that our building would need to be elevated 18 inches to 36 inches off the ground. Wondering how we would utilize a garage that is 3 feet off the ground. I reached out to Cleary. I was told the only option was to cancel the order and loose our 11,000.00 deposit. We had already spent 5000.00 on the prep and we were unwilling to waist the money we had invested so far. We had vacant land in another county and decided to move the build site. Cleary was willing but it would cost us more money. Also we would need to modify the building plans for snow load and to move the awning and a door to accommodate the new build site. .Costing us more money. At this point I had had enough. I had already reached out the Cleary's headquarters with no results. I requested that we be assigned a new sales rep. Our new rep was amazing. For the first time things seemed to be moving forward. Our calls were returned. We were getting navigational directions. Then our new rep called and said he was taking a management position in another city. I actually cried when the call ended. Back to the old rep and nothing getting accomplished. Today was the last straw. Last week we were told that our materials would be delivered on 4/11/2022. That date came and went. No call no delivery. I again reached out to Cleary headquarters. I once again elaborated on what had happened over the past year. Complaining about the lack of customer service at the Pueblo office. I explained that I had only had one individual that had ever stepped up. Instead of getting an apology or even an acknowledgement I was informed that I was falsely giving praise to the staff member that I had mentioned and was told that he had been fired for drinking on the job. I have never been so appalled. That a person in a management position would be so unprofessional as to divulge such personal information about an employee. As of today we have been given yet another date. I have no faith it the new date. My advise is choose another builder. If you have no other options, make Cleary put everything in writing. (EVERYTHING)

Sean Cahill

Sep 29, 2019

•From Google
Had been shopping several building suppliers. Stopped in at the De Soto, IA store. Eventually got a quote and purchased the building we wanted. Took forever to get done and lots of problems, wrong color panels, electrical issues, concrete issues, etc. Still having issues with doors and windows and concrete. Found out manager and salesperson were fired. They were reporting as purchase materials only. New manager came and inspected, told us former manager and salesperson fired because they were erecting buildings but not reporting that to the company and keeping the money for construction. I was not the only one. He was going to help because we were ripped off. Now new manager gone, company will not stand behind the product. Says it is our problem and we have to pay for repairs. It was their employees I bought from, their employees who put it up. We have pictures of the crew doing it. Not my fault they were ripping off Cleary, but they refuse to help. Hearing this from others. NOT a reputable company when I have to be responsible for their employees who got caught doing this and fired. Don't buy from these idiots. OH!!!! Got a call from one of their VPs!!! Instead of trying to help with a solution, he threatened me with slander for telling the truth about what happened to me!!!! Now I really know what sort of company this is!!! They will not be doing my next building, and I will make sure anyone I know that is going to be doing a building will know what I am having to deal with. NOT a reputable company to do business with. As seen by their reply, they are not doing anything to cover for the fraudulent acts by their employees. They did this to several people in the area. They never made any offer to help other than what they most recent manager they dismissed as well, and he was going before he could help. I have found numerous complaints regarding this company online. They are the ones responsible for their employees actions and lies. I am turning everything over to my attorney and talking with the county attorney about their fraudulent actions. Checks were written as I was instructed by their employees.

Jason Klovning

Oct 20, 2014

•From Google
I have had serious problems. The Cleary in-house engineer neglected to indicate to the state that my building would be heated. For this reason state did not prompt either mylsef or Cleary to submit mechanical (heating) plans. Because of a lack of mechanical plans we had to partially re-design my airplane hangar mid-constructon. Cleary denies they are the general contractor and as such they asserted that it was my fault the HVAC plans were never obtained. I originally wanted an office space in the hangar, now this will likely never happen. The concrete floor was poured in a manner I deem improper. The subcontractor did not have the building plans on site. They did not initially follow those plans. The building inspector had to be called, and the job shut down (as the concrete was drying) to get them to properly comply with the plans. Due to the fact the main floor was done in 2 pours instead of 1 there is now a large jagged cracking "cold seam" at the front of the slab. I beleive it looks very ugly. I have had one epoxy contractor refuse to do the floor. I have had a second one tell me it will requre grinding, filling and then treatement. I have had a third tell me he thinks he can epoxy it but it may need touch ups in the future and he couldn't assure me it wouldn't crack. Cleary is, as yet, unwilling to replace the floor. I originally wanted my hangar door to have sheet steel on the back to make it look like a finished product. The original plans have this detailed on them. I was made aware after the door had been ordered ( at a cost over 15,000$ , non-returnable ) that putting sheet steel on the back was not a possibility. I will now have to look directly at the sprayed polyurethane insulation. The crew recently used the wood that had been laying out all winter, molding, to frame in the interior room. They have taken most of it down and have promised to remove and replace the rest, but their willingness to use it in the first place gives me serious doubts as to the professionalism and pride they take in their work. I wouldn't reccomend this company.

Rose Cain

Oct 6, 2021

•From Google
I signed a contract with Cleary buildings 6/17/20 was told it would be completed in August. Here it is October 13 and my building is still not finished. They got their money as I promised to do. The first shipment of product arrived in August and set on the ground for weeks before a crew showed up to start the job. The job was started in September but half way through the crew left to go work on another job. Another crew showed up and put the roof on and completed the shell on September 28th. Im still waiting on my garage door that should have been ordered back in June. I get the whole COVID mess but I'm now being told that the door is still 2 weeks out. I just called my local garage door installer and asked how long it would take him to order me a 14'x14' door. From order to out the door 3 weeks. I am beginning to believe I have been lied to for one because I am a single women whom they think knows nothing about construction. I worked build logs homes for over 11 years and prior worked with my father in the concrete business at the age if 16. I know all about delays. I now own and operate 3 businesses on my own so I get all the issues with COVID. If this is how Cleary Buildings handles its jobs then I can not recommend this company. My expectations when I hired them was to have my building delivered and built within a reasonable time. I don't even with Covid believe it should take 3 months to erect a 49'x61'x 17'8" metal shell with 2 doors. I will say one thing about Roy Roberson my salesman. Very pleasant man who did his job to my expectations and beyond. Update...11-11-2020. STILL DO NOT HAVE A COMPLETED BUILDING. TIME TO GET MY ATTORNEY INVOLVED! Update.... 12-31-2020. AFTER BEING PROMISED MY DOOR WOULD BE INSTALLED 12-28- 2020...IT COMES AS NO SUPRISE IT IS NOT INSTALLED!!! CLEARY BUILDINGS IS A TOTAL JOKE OF A COMPANY THAT GUARANTEES CUSTOMER SATISFACTION. ABSOLUTELY DO NOT USE THEM. IVE CALLED THEIR CORPORATE OFFICE TOO AND WAS GUARANTEED BY THEM THAT DOOR WOULD BE INSTALLED ON THE 28TH. NOTHING BUT A BUNCH OF LIARS.

john rappel

Jul 14, 2024

•From Google
** See Updates Below ** I contracted Cleary in 2021 to erect a post frame building on our property. Overall, the experience was what I would expect. However, one significant source of pain that still remains is how they installed the radiant tubing in the slab (to be clear, Fischer Concrete installed the tubing but were subcontracted through Cleary). The tubing that was used is a mixture of orange, blue and red pex. The orange is the correct, oxygen-barrier tubing, but the blue and red are for potable lines and are not suited for in-slab installation for radiant systems. I have been dealing with this back-and-forth for several months (after finally realizing their mistake since I am not a licensed HVAC technician). ** Update ** I am very happy to report that Cleary DID stand by their word and make it right. After a thorough review of the issue they worked with me found several HVAC contractors to provide an estimate to rectify the issue. After vetting multiple companies, Nicolet Heating and Cooling (NHC) was chosen to perform the work. The work has since been completed and my system is now fully up to code (See new image). To correct the issue, a copper plate heat exchanger was introduced and the single loop was split into two separate loops.
Is this your business?

This business hasn't been claimed yet. Claim it to manage your listing.