
Overview
Serves Delta, CO
Business hours
SunClosedMon8:00 am - 6:00 pmTue8:00 am - 6:00 pmWed8:00 am - 6:00 pmThu8:00 am - 6:00 pmFri8:00 am - 6:00 pmSat9:00 am - 2:00 pm
Payment methods
This pro accepts payments via Cash, Check, Credit card, and Debit card.
Services offered
Contact
+19708741066
715B US-50, Delta, CO 81416
Reviews
3.0
85 reviews
5
4
3
2
1
Shaundra Pittenger
Oct 20, 2022
•From Google
just nowNEW
We signed our contract with Cleary buildings on 3/19/2021. We had never had anything built before. We had lots of questions and concerns since our property was in a flood zone. We wanted to make sure this would no cause any unforseen issues. As we had a set budget and would be unable to go over. Our sales rep assured us this would not be an issue and that he would hold our hand through the entire process. That he would help with the permits and anything else that would need to be done. They told us the build would be completed by the end of July. We never heard a peep from them after that . On August 3rd we reach out to our sales rep. We were told that they were having issues with Pueblo Zoning. Because the explanation didn't make sense. I contacted Pueblo Zoning and was told they had only had one email concerning our property and it was dated August 1st . The zoning office informed me that there was indeed a process when building in a flood zone. Starting with an enginer to the tune of $2000.00 . Who informed us that our building would need to be elevated 18 inches to 36 inches off the ground. Wondering how we would utilize a garage that is 3 feet off the ground. I reached out to Cleary. I was told the only option was to cancel the order and loose our 11,000.00 deposit. We had already spent 5000.00 on the prep and we were unwilling to waist the money we had invested so far. We had vacant land in another county and decided to move the build site. Cleary was willing but it would cost us more money. Also we would need to modify the building plans for snow load and to move the awning and a door to accommodate the new build site. .Costing us more money. At this point I had had enough. I had already reached out the Cleary's headquarters with no results. I requested that we be assigned a new sales rep. Our new rep was amazing. For the first time things seemed to be moving forward. Our calls were returned. We were getting navigational directions. Then our new rep called and said he was taking a management position in another city. I actually cried when the call ended. Back to the old rep and nothing getting accomplished. Today was the last straw. Last week we were told that our materials would be delivered on 4/11/2022. That date came and went. No call no delivery. I again reached out to Cleary headquarters. I once again elaborated on what had happened over the past year. Complaining about the lack of customer service at the Pueblo office. I explained that I had only had one individual that had ever stepped up. Instead of getting an apology or even an acknowledgement I was informed that I was falsely giving praise to the staff member that I had mentioned and was told that he had been fired for drinking on the job. I have never been so appalled. That a person in a management position would be so unprofessional as to divulge such personal information about an employee. As of today we have been given yet another date. I have no faith it the new date. My advise is choose another builder. If you have no other options, make Cleary put everything in writing. (EVERYTHING)
Jason Klovning
Oct 20, 2014
•From Google
I have had serious problems.
The Cleary in-house engineer neglected to indicate to the state that my building would be heated. For this reason state did not prompt either mylsef or Cleary to submit mechanical (heating) plans. Because of a lack of mechanical plans we had to partially re-design my airplane hangar mid-constructon.
Cleary denies they are the general contractor and as such they asserted that it was my fault the HVAC plans were never obtained. I originally wanted an office space in the hangar, now this will likely never happen.
The concrete floor was poured in a manner I deem improper. The subcontractor did not have the building plans on site. They did not initially follow those plans. The building inspector had to be called, and the job shut down (as the concrete was drying) to get them to properly comply with the plans.
Due to the fact the main floor was done in 2 pours instead of 1 there is now a large jagged cracking "cold seam" at the front of the slab. I beleive it looks very ugly.
I have had one epoxy contractor refuse to do the floor.
I have had a second one tell me it will requre grinding, filling and then treatement.
I have had a third tell me he thinks he can epoxy it but it may need touch ups in the future and he couldn't assure me it wouldn't crack.
Cleary is, as yet, unwilling to replace the floor.
I originally wanted my hangar door to have sheet steel on the back to make it look like a finished product. The original plans have this detailed on them. I was made aware after the door had been ordered ( at a cost over 15,000$ , non-returnable ) that putting sheet steel on the back was not a possibility. I will now have to look directly at the sprayed polyurethane insulation.
The crew recently used the wood that had been laying out all winter, molding, to frame in the interior room. They have taken most of it down and have promised to remove and replace the rest, but their willingness to use it in the first place gives me serious doubts as to the professionalism and pride they take in their work.
I wouldn't reccomend this company.
Richard Braun
Feb 23, 2024
•From Google
Cleary did a nice job on my pole barn over hang edition.
BUT, they did not show up in October or November when I was at my cabin, even though I made numerous phone calls to their Escanaba, Michigan Office and talked with Phil, whom assured me they would come then, but continued to procrastinate until January!
Since I could no longer be there, he asked for my gate and pole barn keys. My neighbor checked on my property just a few days before they arrived and everything was okay.
Unknown to me and Phil from Cleary, their job Foreman shut off my propane! No utility company was called to mark those under ground lines either.
He did turn the propane back on, but by then my pilot lights went out on my heater in my pole barn apartment and also my cabin.
We live 8 hours away and my cabin neighbor lives in another state too. He was able to check on the property a month later and discovered my frozen pipes in both buildings.
Both water heaters were frozen and ruined, the pipes survived okay in the pole barn, because they were pex. In the cabin there are at least 8 burst copper pipes. The in line water freezer broke and all the food in our refrigerator was ruined.
I talked to Phil who admitted they had shut off my propane. I asked they work with me reference this damage , so I wouldn't have to take them to court. He said I was a good customer and he would do what he could.
He said he would have to tell his ''Big Boss.'' On his call back he said his answer from his boss was, ''not our problem as he should of checked on his property!'
We couldn't be there there because my wife got diagnosed with cancer and needed surgery. You refused to come on the agreed dates in our contract and caused at least $10,000 in damages!
Andrea Dearth
Oct 20, 2022
•From Google
I wanted to add an extension onto my existing Cleary building several months back. I contacted them through the website and was directed to the south Kansas office. It took weeks to get an estimate, which I thought was high, so I completed getting some additional bids. Everything thing has gone up and so I asked for a material list and pricing only quote. It took a while, and when I got it it seemed too high for what I was doing so I reached out to a contact I had from when I had it built, and he told me that it was right and he would have the Kansas office reach out to me. After two weeks, (no response) I contacted the Kansas office once again, gave them all the measurements for me to get a quote for just the matching metal and trim as it made sense for me to buy the lumber and have it installed locally at about 30% of what they wanted just for the materials. I asked if they could and would let me buy the metal from them, (matching colors) so I gave them all the measurements. I was contacted by email that I would take more than a week to get the quote and that if I made a decision to purchase that it would take 6 to 8 weeks to get the product. Not fully understanding that they don't have a price per linear foot and trim cost but I accepted that it may be a few days. It has now been a month since my material list was submitted. (Still no contact or price of metal) Too add to no response, I was on the roof to get the measurements and only half the screws on the existing building are in place. I thought they built an very nice building when it was done, but never climbed up on the roof to see if all the screws were put in place. Very disappointed with the workmanship and the lack of information available.
Terry Happ
Oct 20, 2017
•From Google
I purchased a building in July 0f 2016 with the idea that it would be done in September, a month later the Lebanon Indiana Manager shows up to set up the site and tells me that if the dirt work was not done the material
would not be ordered. I said then we need to cancel this until the dirt work gets done he said nope you signed the contract and there is a restocking fee. I received a phone call from the region manager that
stated this. (ON MATERIALS THAT HAVE NOT BEEN ORDERED) is what
I said. So basically they had nobody to build my building.
This building is about as far from being right as it can be and it
can be seen by naked eye... Finally in January 2017 the only worker left on the crew shows up in dark demanding the final payment on a building that was not finished, screws missing, j channel not even attached
poor very poor quality. I said no the doors where not installed correctly
the next day started the harassing phone calls about a lien on my property and after three weeks of this I received notification that they had put a lien on my property on a building that was not finished
and is a mess!!!!!
I had way more important things going so I made the final payment to get them to go away.
Ok so I have complained enough to this company that they all knew about the issues including upper management as I was harassed
by the president of operations for more money(it is documented) the VP of operations has stated that they reviewed this with their management and no one was aware...
Read the reviews and this building is on display to show their
workmanship!!!!!!!!!!!!!!!!!!!
google name
Is this your business?
This business hasn't been claimed yet. Claim it to manage your listing.