
Overview
Serves Southlake, TX
Business hours
SunClosedMon8:00 am - 6:00 pmTue8:00 am - 6:00 pmWed8:00 am - 6:00 pmThu8:00 am - 6:00 pmFri8:00 am - 6:00 pmSat9:00 am - 2:00 pm
Payment methods
This pro accepts payments via Cash, Check, Credit card, and Debit card.
Services offered
Contact
+18002665677
2850 Market Loop, Southlake, TX 76092
Reviews
4.0
1350 reviews
5
4
3
2
1
Andrew Trieger
Sep 23, 2017
•From Google
Efficient, clean, professional, responsive... exactly what I needed.
I don't know about the other bad reviews here, but my experience was certainly nothing like those. I had water damage in my new construction perfect gorgeous home. In panic mode, I found them through google maps, called, and they very kindly had a "first responder" come out same day. That was faster than my insurance company or insurance company's restoration contractor. (Who was able to come the day after but communicated poorly and had no water-detecting tools, just was eyeballing on what drywall to replace (the NON-JC person I mean).
So that day, the first responder came out and assurances about mold or not (We have mold allergies and are very worried about wet drywall or missed wet spots) he was able to prove where the moisture was with a thermal imaging camera. We could see where it seeped and ran, which drywall to replace ,which to just dry, and how to prove it was dry.
He stayed as long as we wanted, communicated very efficiently, took a deposit and I signed papers authorizing them to come start drying the NEXT day. Since I was nervous home-owner and mold-crazy guy, instead of 2 guys they sent 4, even though it was a small job, just to get it done a little faster as we worried about anything sitting wet for too long.
Next morning, first thing, they showed up, more thermal cameras, everyone spoke English fine easy to communicate with. They covered our new cabinets with cardboard plastic and tape, covered way more than we needed whatever I asked, (paying by the hour, sure, but still they were happy as they should be to do more work, yay). Hung a dust-catching plastic tarp, hooked up a dust-filtering fan just for while they worked, removed the drywall, bagged it INSIDE the tent, then carried outside... as if it was a hazmat team or something (Its just a few sheets of wet drywall but this made us real happy).
They hooked up a few industrial driers and plastic vents routing lots of hot dry air through all the places the water was, and every 24 hrs one of them came back to take readings.
I was also keen to make sure they'd provide whatever documentation my insurance company required and they were happy to do that, or already did, took pics of everything, documented who was here, how long, what they did, the moisture readings, etc. Once it was dry (2 days) they took all their stuff out, very clean.
No mud on the floors,
no scuffs on the floors,
no dropped tools on the cabinets or counter tops,
no arguing or complaining or anything, they even stopped work and just stood outside so I could get some breakfast for the kids. I mean, I'm paying hourly anyways I guess, but so many times contractors are too overly booked to waste 20 min standing around, their mgmt penalizes them or what have you, but here it seemed clear their management told them "customer satisfaction is priority one." Fine by me.
In the end, the bill seemed appropriate to me, hours, #s of people, machines, etc. All itemized. My insurance company thought so too and paid them.
Lastly, I needed to get the drywall replaced/re-painted which they do also, although I have a neighbor that needs the work so I went with him which they were fine with.
So, everything basically worked out exactly how a home owner with water damage would want. Thanks JC.
I'm going to go post this on Yelp too and maybe Angie's list so others can hopefully find them in an emergency...
Tim Schilling
Sep 17, 2019
•From Google
I need to preface this review with the fact that the bathroom does look nice and the employees of Menold were very polite and courteous. However, the project took much longer than expected, there were too many issues along the way in my opinion and a few irreparable gaffs that left me upset regarding the project as a whole.
We were told that the project (remodeling the one bathroom in the house) would take 2 weeks, but to not hold them to that. That's a reasonable statement. I hoped that it would be done in 2, planned for 3 and would have accepted 4 weeks. Unfortunately it stretched to 6 weeks (43 days from start to finish). Of that 9 work days there was zero work done. For all but ~4 days we were without a toilet and/or shower.
During the project there were a few mistakes that had to be fixed:
- The wall between the bathroom and adjoining closet was cut through when it shouldn't have been. There were clothes in the closet, but were thankfully unharmed.
- A small 1" diameter circle part of a shared wall was damaged during demo that was later filled and repainted.
- After the new drywall was hung, the old light fixture was installed. This had to be removed, the holes filled and painted over before the correct light fixture was installed.
- The main sewer drain was not sealed properly and leaked until someone came back to close it properly.
- The shower drain that was installed was not installed properly, nor tested. It leaked a ton of water until someone came back to glue a joint together.
- The sink drain had a faulty part that leaked. I caught the leak after it was installed. A person came out and fixed it.
There are a few minor things that are still existing and likely bother me because of the other issues in the project:
- A scratch on the bathtub when they temporarily moved the toilet into it.
- The shower head being slightly off-center.
- The door to the vanity being at an angle (closes fine though)
- The light switch case is not level.
The communication during the project was also frustrating. Seeing as this was my first experience with a construction/remodeling contracting company I likely made some bad assumptions and mistakes regarding communication during the project. From my perspective this is what occurred: The salesperson had me explain the needs of the project and asked for me to pick out certain fixtures that would be installed in the house. The superintendent on the project required me to reiterate almost all of the information of the project to them. The demo crew that showed up also needed parts of the project reiterated before they began. Once the demo and basic remodel was done, it became clear there wasn't much communication within Menold regarding this particular project. The light fixture had to be sent to them multiple times. The expectation of sending the link and SKU to the salesperson was that that particular items would be installed. Instead we found out that they didn't communicate that within the company and we had to resend it to other people. We were told that a similar mirror and wall cabinet would be installed, but this wasn't tracked or communicated. While not a major problem, it was disconcerting and was simply another pain point in the project.
We were asked to pick out the flooring 2 weeks before the project began so that it could be ordered and ready to go when it was needed. The flooring wasn't installed until 4th week of the project. After talking with the flooring salesperson it seemed like the product wasn't ordered or coordinated until the project began rather than before. I still don't know what exactly the problem was here, but something didn't go according to plan.
Dylan Brauer
Sep 23, 2020
•From Google
J.C. Restoration (JCR) recently completed a water damaged project at my house.
I am absolutely 100% thrilled with their work! Every aspect from the first initial phone call to the final inspection that was done today was handled perfectly.
Everything they did was executed exactly as it should be. I should know... I own a small cleaning and restoration company (This job was outside my skill set). You can rest assured that when you call JCR, you are dealing with an honest company that is at the forefront of their industry. They will thoroughly inspect your job. Assess what needs to be done. Use the proper equipment and methods that are both effective and safe for your home and your family (pets too). The equipment they use is clean and new. And their employees are on time and friendly. They work efficiently and are respectful of your time.
Restoration work can be time-consuming and often takes days or even weeks or months. I felt completely comfortable leaving the JCR team in my house unaccompanied. This was a huge help as it allowed me to go to work everyday.
The source of my water damage was the furnace humidifier which is on the second level. The water came down through the ceiling and leaked on to the hardwood floor in my bathroom below. It also went down through the wall cavity that separated the bathroom from my kitchen. There was a 2 foot by 4 foot section of ceiling in my kitchen that was affected along with the majority of the 5 foot by 8 foot bathroom ceiling.
JCR came to inspect my house the day after I called at my request. We agreed it was best to begin work a couple days later. The mitigation team arrived and within 2 hours they installed makeshift plastic tarp walls to contain the area that needed drying. This protected the rest of my house from cross contamination and made their drying efforts more effective. They also removed the wet drywall and wood trim. They placed the necessary drying and air cleaning equipment along with multiple fans that day. The remaining wood was dried and treated with an antimicrobial treatment. Once this was completed the next team from JCR came in and replaced the missing drywall and painted all the necessary surfaces. The finished product looks better then before I ever had any water damage!
I assume if you're reading my review you have probably had a flood or fire and you have no idea what company you should use or where to begin. Call the 24 hour J. C. Restoration and let them help you.
Acting quickly is important. Ask questions. Take lots of pictures before, during and after. Take good notes. Keep a file with every contractor's business card and paperwork. Have your homeowners insurance information ready if necessary. They may need to be involved. Before you know it your house WILL be okay again. You WILL be happy called JCR. Good luck!
Tom Chi
Sep 17, 2020
•From Google
This is really three reviews in one, so although I average it out to five stars, you may want to read each part carefully.
Our basement flooded over the weekend in June. Turns out the "frost-free" valve wasn't so frost-free after all. My wife called them up on Sunday (Father's Day) and within an hour Tony came over with fans to start drying everything out. He came over daily, texting or calling in between to let us know when he was coming. As various parts dried out faster, he moved the fans around to get the more stubborn places, and removed part of the subfloor so the fans could do their work better. He removed the fans promptly, and took many pictures to document his work for the insurance company. We never had to get involved with any checks or payments for the water mitigation work. Five stars for Tony.
Because we'd had such good experience with the water mitigation, we naturally turned to AIR for the restoration work. This didn't go as well. We didn't get an estimate until early July, and didn't get any work started (demo) until early August. I wasn't expecting this to go quickly, especially since we drastically changed the scope of the project (bathroom upgrade) right as we were starting. But by September I was very dissatisfied. The project manager didn't show up when promised, didn't return phone calls, and the people didn't show up when scheduled either. We had an entire week with no apparent progress and no contact. When it was time to apply for the permit with the town, it became clear that he had never applied for a permit before, and either couldn't be bothered or didn't know how to look up basic information about the house. Not only was the project going much slower than projected, but I had no faith that it could be carried out properly. One star for the way this project started out.
I called AIR again in early September with my concerns, and they put me through to the president (Steve?). He then passed me off to Chris Fox, senior project manager, who was familiar with our plans. He took over the project and things went very well after that. Chris did a great job of communicating and, well, managing. He coordinated with the various subcontractors to get them in order, and when there was a change of plans, he would send me a quick text or call to let me know. He kept up with the town and scheduled inspections in an orderly fashion. He asked my own work schedule well ahead of time and planned around it accordingly. Above all, he stayed in touch, even on weekends if needed, and came to check on the site frequently. Overall the whole project came in on time and on budget. I understand the previous project manager is no longer with them. Five stars to Chris, and to AIR for proper service recovery and making sure everything turned out all right in the end.
oneto liveby
Oct 20, 2019
•From Google
June 22, 2017
Dear Lyle,
I wanted to take a moment to express my sincere appreciation for the outstanding job United Services did for The Plaza in Clayton United Services was called out 12-30-2016 for an approximate 2,000 gallon water leak that extensively damaged 4 units and common areas in my building. The immediate response to the call and fast acting water mitigation services performed by your staff saved The Plaza thousands of dollars in common area carpet loss. The team did a phenomenal job and I sincerely appreciated all their efforts. The unit owners weren't so lucky and suffered the brunt of the water leak, most having hardwood floors throughout their unit. When it was all said and done the insurance claim was in excess of $200,000. Greg McDowell came in and did all the estimates in the cost to restore the units back to their original finishes. All the units in The Plaza are custom built, no two units and most finishes are alike. I know that was a timely and tedious task and I appreciate all his efforts. He is a master at his trade and was able to give accurate pricing and supplemental needed as we progressed thru this process working with our insurance claims adjuster. A huge thanks to him.
Brennon Shoemaker was the project manager and what a trooper. He endured a very tedious and timely task of finding and matching up these custom finishes, putting all these units in original condition. Everything came out perfect. As some unit owners were understandably frustrated by the situation at hand and had to be moved out of their unit for some periods of time, the understanding, consideration and compassion Brennon displayed to each of these unit owners were unparalleled to anything I have ever seen. Some people don't listen with the intent of understanding but listens with the intent of responding. Brennon understood completely. Every Friday progress reports were given to me and these residents. They really appreciated it and this proved essential in maintaining the ongoing great relationship with each of these unit owners. It truly made all the difference as progress was being made and unit owners needs being met. It took 3 months to totally complete the damages that occurred and each resident was more than happy to sign the release form of completion satisfaction document. They were very happy with the end product. For that I cannot thank United Service, especially Brennon for the prompt, dedicated and loyal service given to me and those residents at The Plaza in Clayton. It's really not a matter of if, but when I need services like this again and hands down United Services will be called. Thank you so much.
The Plaza In Clayton Community Manager,
Dustin Coleman
Is this your business?
This business hasn't been claimed yet. Claim it to manage your listing.